When RA International Global Operations had a requirement for a UK classified work facility, they were recommended Cre8tive Space by their landlord, who are also a customer of ours. RA International specialises in the construction of buildings, roads and other infrastructure, integrated facilities management and supply chain for construction, operation and maintenance, in remote or conflict areas, even under the most challenging supply and logistics scenarios.
The UK facility needed to provide both classified and non-classified areas for both work and relaxation. Special consideration was made to the lighting as the premises had limited natural light. Sound attenuation was also a hight priority and was achieved using a number of methods including specialist wall construction, acoustic door sets and attenuation in air ducts. The design provides a light and bright facility with new furniture and seating to allow different areas to function flexibly.
Technical infrastructure includes specialist CCTV, alarm systems, dual authentication access control, class 3 locking mechanisms and fibre optic infrastructure. This is all supported by the physical build which provides and maintains a secure facility which is FSC (LIST X) accredited.
RA International has locations around the globe including Somalia, DRC, Libya and Sudan – it was great to be chosen to design and build the new UK project office.
Testimonial from John Mitchell, RA International
"Just wanted to reach out to thank you and you and your team for delivering our office to the exact standard required, within the budget and bang on time. Without doubt the experience of fulfilling a detailed client requirement was made so much easier with the Cre8tive team on our side.
"The quality of work, the key communications and a professional and enthusiastic team was exceptional. It has been clearly evident, throughout the whole process from design stage to the finished product, that you have a distinct and expert approach to customer satisfaction.
Please accept and pass on our sincere thanks to all involved in delivering a first-class office to the exact specifications needed for us to perform our role with the MOD. Well done."
留言